GEME Titans Commercial Composters
Stop shipping food waste away.
Process it on site.
GEME Titans are commercial aerobic bio-processing systems designed for restaurants, campuses, communities, supermarkets, and municipalities.
10–10,000 kg/day
Capacity range
≥90%
Volume reduction*
45–75°C
Controlled bio-chamber
*Volume reduction depends on waste type, moisture content, loading pattern, and operating conditions.
Image placement
Replace with a dark-toned real installation image: Titan system integrated into a commercial kitchen, supermarket backroom, or community waste station.
Food waste is not just waste.
It is a daily operating cost.
Collection cost
Food waste often leaves your site as a recurring hauling bill. Titans help reduce the amount that needs to be stored, moved, and collected.
Odor & storage pressure
Wet organic waste quickly becomes a hygiene challenge. On-site processing shortens the time waste sits in bins and reduces back-of-house pressure.
Sustainability reporting
More organizations need measurable waste-reduction actions. Titans give your team a visible, operational response that can be evaluated project by project.
Not a dryer. Not an incinerator.
A controlled biological processing system.
1. Load
Food waste enters the system through a commercial-grade chamber, with optional lifting, sorting, or pre-treatment depending on the model.
2. Bio-process
Inside the chamber, temperature, oxygen, moisture, and mixing are managed together to support aerobic microbial breakdown by the Kobold biome.
3. Reduce
Organic matter is broken down over time, significantly reducing volume and leaving a residual compost base that must be handled according to local rules and project conditions.
[Image Spec: 3D Engineering Cutaway]
Dark background. Semi-transparent shell revealing the aerobic chamber, mixing shaft, moisture-control logic, and odor-control path.
Engineering proof
SUS304 contact areas
Used in current model specifications for key food-contact areas.
Controls
PLC-based management
Selected systems support intelligent PLC control and project-level configuration.
Monitoring
Remote visibility
Remote monitoring and data-sharing options are available on selected installations.
Modules
Project-specific handling
Lifting, sorting, or dewatering modules can be configured based on the site.
Built for places where food waste appears every day.
Restaurants
Reduce bin pressure
Hotels & Resorts
Manage close to source
Supermarkets
Process expired produce
Municipalities
Decentralized treatment
Find the right Titan for your daily load.
Choose the closest daily waste range. We will use this as a starting point for sizing, site planning, and quotation.
Select estimated daily capacity
Recommended model range
RS-BIO-300
- Best fit for: Supermarkets, medium communities
- Daily capacity: 300 kg/day
- Est. footprint: Approx. 5.5 m²
- Avg. energy/day: 25–35 kWh/day
-
Sizing note:
A balanced choice for mid-sized sites that need stronger daily throughput.
Designed for daily operation, not occasional demonstration.
Food-contact durability
Key contact areas use SUS304 stainless steel in current model specifications.
PLC and remote monitoring
Larger models include intelligent PLC control, with remote monitoring and data sharing available on selected systems.
Modular handling
Selected models support lifting, sorting, or dewatering modules depending on project needs.
Evaluate the project, not just the equipment.
The question is not only “How much does it cost?” It is “How much waste can we stop moving every day?” A Titan project should be evaluated against your current hauling frequency, storage pressure, and waste-handling workflow.
Site assessment needs
- 1. Estimated food waste per day
- 2. Waste type (scraps, produce, mixed)
- 3. Available floor area and power supply
- 4. Indoor or covered-outdoor readiness
From waste audit to installation plan.
Waste profile
Review volume, site constraints, and goals.
Recommendation
Recommend a Titan model configuration.
Site planning
Check space, power, and operator needs.
Quotation
Receive a project-level proposal after site review.
Deployed in real operational environments.
Example application: Hotel operations
Goal: Keep waste managed close to generation
Example application: Municipal pilot site
Goal: Add decentralized capacity before long-haul transport
Before you submit
Questions before a commercial project.
Most commercial conversations start with the same practical questions: fit, space, utilities, output, and timeline. These quick answers help a site team decide whether it makes sense to move forward with an assessment.
Is GEME Titans a dehydrator? +
What kind of food waste can it handle? +
How much space and power does a site need? +
Can it be installed indoors or in a covered outdoor area? +
What happens to the output? +
Does every site need the same configuration? +
How long does a project review usually take? +
Request a Titan assessment
No generic equipment quotes first. Tell us your waste volume, and we will review your site conditions before recommending a capacity range.
